Reproduced from the project's own build guide for BuoyBot-Torpedo. The renders come from its 3D model; none has been printed or floated yet, so every figure is from the model, the slicer or the hydrostatics. The print files, the itemised parts list, the wiring guide and the carrier-board documentation are kept with the project and are not published here — references to them appear below in plain text.

Step-by-step instructions for building one BuoyBot-Torpedo: a small round float on a soft link over a streamlined printed body, the torpedo, that carries the battery, the thrusters and the electronics 0.8 m under the surface. Every structural part prints on a 250 mm FDM printer; the rest is bought parts, a soldering iron and a few hand tools.

Applies tothe BuoyBot-Torpedo design of 2026-10-20, as revised after its independent review: a 220 mm printed PETG float carrying the antenna and the Feather; a 108 mm printed torpedo (PETG shells, PLA sleds) carrying one stock 6 Ah battery pack, both pods (raised 58 mm above its axis), the ESCs, the carrier, the GPS board and the compass; joined by a soft link of a shock cord and a coiled 12 × 8 mm hose (about 85 N/m together), with a Dyneema limit line
Unitsmillimetres
StatusNothing has been printed or floated yet. Every figure here comes from the model, the slicer or the hydrostatics script. Treat the first one as a test article
Why it is built this wayTORPEDO_BUOY_DESIGN.md
Buy firstPARTS_ORDER.md, the spar's electronics plus the list in TORPEDO_BUOY_DESIGN.md §11
Wiring referenceWIRING_GUIDE.md; the carrier is wired as on the spar (BUILD_GUIDE.md step 6.3), with a longer link to the Feather
Source of every dimensiondesign/torpedo/torpedo_dims.py: the Fusion model, the print files and this guide all read from it

Contents

What you are building

The finished buoy
The finished buoy
Side view from port, bow on the left: float, link and torpedo
Side view from port, bow on the left: float, link and torpedo

A float 220 mm across and 263 mm tall rides at the surface with its waterline 99 mm above its bottom. 0.8 m below it, on a soft link, hangs the torpedo: a 108 mm canister, 427 mm long with its tail fairing, with a thruster pod on an arm either side of its tail, a keel of lead under it and a fin on top with three shackle holes. The link is a rubber shock cord and a 12 × 8 mm recoil hose coiled round it, side by side between two shackles. The hose carries every cable between the two bodies, dry inside, and is a spring as well, so it is counted as part of the link.

It is made of five modules:

ModuleWhat it isWhen you service it
Tail cupthe canister's back half: the aft face with three cable glands and the test valve, the dorsal fin with its three shackle holes, the rail the keel bolts to; the pods on two pod mounts round it; the tail fairing behind itstays put
Sled stackthe aft sled (battery, both ESCs, a lead tray) and the fore sled bolted between its rails (carrier PCB, GPS board, compass, a lead tray), built on the bench and slid into the canister as one pieceslides out of the tail cup in one piece
Nosethe canister's front half, a cover with two O-rings that screws on over the fore sledunscrews in 2 turns
Floatthe float body with the hose gland and the eye plate underneath, the SP13 charge/ON socket and its own test valve on its upper cone; the mast inside carrying the Feather and the antenna; the cap that screws over itthe cap unscrews in 1⅓ turns
Linkthe shock cord and the hose, both on the two shackles, with the Dyneema limit line; the harness and the antenna coax in the hose, potted at both endsstays joined

The float and the torpedo are joined for good by the hose and its cables once step 10 is done. Treat them as one buoy from then on.

Five things about the design shape the whole build:

Before you start

Directions

The buoy has a bow: the direction the thrusters push it.

Views from the port side, like the side view above, have the bow on the left. Write BOW on the nose and an arrow on the tail cup's fin as soon as each is printed.

Where measurements start

Torpedo, along its axis: z_l is millimetres forward of the outside of the aft face.

z_lWhat is there
−80tip of the tail fairing: the hose comes in here
−14 to 61the pods; their collars centred at 23
0outside of the aft face: three glands and the test valve
4inside of the aft face
14tops of the three bosses; the aft sled's base disc sits on them
44 to 210the fin on top and the keel underneath
50 to 158the battery; ESC R on top of it aft (56–99), ESC L forward (103–146)
56, 78, 170hose tie holes across the fin (56 is on its sloped aft end)
66 to 198the keel's lead slot; its keeper bolts at 198 and 205
74, 190the keel's bolts through the rail
87, 99, 111the fin's three shackle holes, 10 mm below its top; 99 is the nominal one
118 to 205the aft sled's rails
158.5the aft sled's floor, walls and battery tray end
164 to 254the carrier PCB; the fore lead tray under it runs to 258, its keeper bolt at 260
168 to 194the tail cup's bore, where the nose's O-rings seal; its 18° lead-in is the last 3 mm, 191–194
178, 200the fore sled's bolts through the rails
218the tail cup's rim
254 to 266the gap for the coax's right-angle SMA plug
266 to 309.5the GPS board
300the nose's cylinder ends, its 45° cone begins
325the compass
347the nose's tip

Torpedo, in the water: depths below the still waterline.

DepthWhat is there
708tops of the pods: the torpedo's shallowest point
716top of the fin
726the fin's shackle holes
742the pods' axes
800the canister's axis
917bottom of the keel: the deepest point. It heaves up to about 0.33 m in a 0.5 m wake: allow at least 1.4 m of water

Float: z' is millimetres above the float's flat bottom.

z'What is there
−16the eye plate's shackle hole, on the float's axis
0the float's flat bottom: the hose's gland (bow side), the eye plate
12top of the bottom boss, inside: the mast's flange
85the widest point, 220 mm
99the waterline with the torpedo hanging
128the SP13 (port) and the float's test valve (starboard), on bosses on the upper cone, 29 mm above the still water
150the Feather shelf
156 to 172the thread; the cap's skirt covers it
172 to 190the spigot with the two O-rings; its rim at 190
188top of the antenna platform, just inside the spigot's mouth
263top of the cap

Schedule

The printing takes most of the calendar. The rest is set by cure times.

StageStepsWorkLeft to cure
Print1about 48 h of printer time; the float body alone is 11 h—
Day 12, 3clean up, tap, inserts; first epoxy coat; dip the keel's lead barsepoxy coat
Day 23, 4, 5second coat; fittings; dry fitepoxy coat
Day 36–10pressure test; pods; harness through the hose; size and fit the link—
Day 411–14sled stack, float fit-out, bench test, potting both endspotting
Day 515–19stack in; thrust and current; close up; keel; tank trim—
Day 620, 21fairing, compass, first water—

Cure times

JobBefore the next operationBefore a pressure test
Laminating epoxy coatper the epoxy's data sheet, typically 24 h24 h
Epoxy on the keel's lead bars24 h—
Flexible potting in the hoseper the compound's data sheet, typically 24 hfull cure
Heat-set insertsuntil cool, a minute or two—

Cold slows everything: below 15 °C, double these.

Safety

Working rules

  1. Dry-fit before anything is permanent. Inserts, epoxy and the potting can't be undone.
  2. Label both ends of every wire as you cut it.
  3. Weigh, do not estimate: lead, the torpedo, and the finished buoy.
  4. Pass each Check before moving on. Every check is quick now and expensive once the nose is on.

Tools

ToolUsed for
The printer (250 × 250 × 250 mm build volume), about 1.5 kg of PETG and 0.25 kg of PLAevery printed part
M16 × 1.5 and M20 × 1.5 taps and a tap wrenchthe gland holes
Soldering iron with a heat-set insert tip, long enough to reach about 205 mm down inside the tail cupM3 and M4 inserts; wiring
Stainless locking wiremousing the two shackle pins
400 and 600 grit wet-and-dry; a deburring knifethe sealing bores; print clean-up
Calipers, steel rule, fine markerchecks; cutting the lead
Hacksaw and filecutting lead bars to fit the slots
Hex keys; a ball-end 2.5 mm hex driver at least 230 mm long; 5.5 and 7 mm spanners or nut drivers; a thin 17 mm open spannerM3 and M4 screws and nuts; the base screws 205 mm inside the tail cup; the fairing's screws through its tip; the SP13's nut inside the float
Kitchen scale (5 kg × 1 g); luggage scale (to 20 kg)lead; part weights, the torpedo's weight, thrust, the hose's pull
Weights of 1.5 kg and 0.5 kg (bags of lead, weighed)sizing the link
Spring balance or luggage scale that reads 1.5 kg wellthe tank trim
Clamp meter (DC)battery current at the thrust test
Bicycle floor pump with a Schrader head and gaugepressure tests
A tank, water butt or bath at least about 350 mm deep and 500 mm long; weightspressure tests; the tank trim
A bucket or tub about 400 mm deepthe thrust test
JST-XH crimp tool; an SMA crimp tool for RG174the harness; the antenna coax
Heat gun, wire strippers, multimeterwiring

Consumables: laminating epoxy (about 300 g, some for the keel's bars), flexible potting compound (silicone or polyurethane), a little putty, silicone grease, adhesive-lined heat-shrink, thin VHB tape, cable ties and thin hook-and-loop straps (12 mm wide or less), isopropyl alcohol, masking tape, nitrile gloves, mixing cups, desiccant for both bodies, closed-cell foam, solder.

Printer and filament

The parts print in PETG or PLA (the table in step 1 says which) on the slicer's stock Anycubic PETG or Anycubic PLA and 0.20 mm Standard profiles for the Kobra S1's 0.4 mm nozzle, with these changes:

SettingValueWhy
Walls6the 2.6 mm skin prints as solid perimeters
Top / bottom layers5 / 5
Infill15 % gyroid
Seambackone straight seam, easy to check and seal
Supportsoffno part needs them (step 1)
Brim5 mm, outer only, on the keel, nose, float cap, mast and fore sled; off on the restthose five stand on small footprints
Prime toweroff

The print-ready STLs, already turned to their print orientation, and a slicer project per part with these settings and its material in it, are kept with the project in design/torpedo/print/.


Print and prepare: steps 1 to 3. Print, turn the prints into parts, seal the shells.

Step 1 — Print the parts

Time: about 48 h of printer time; minutes of yours per print.

PartMaterialOn the bedBrimTimeGrams
Float bodyPETGflat bottom—11.3 h425
Tail cupPETGaft face—8.8 h343
NosePETGspigot rim5 mm5.2 h209
Float capPETGskirt rim5 mm3.5 h136
Aft sledPLAbase disc—3.4 h103
MastPETGbase flange5 mm3.3 h66
KeelPETGfore end (the lead slot open on the bed)5 mm3.2 h100
Fore sledPLAaft end5 mm2.5 h71
Pod mount PPETGaft face—2.0 h76
Pod mount SPETGaft face—2.0 h76
Tail fairingPLAfront rim—1.1 h35
Antenna platformPETGdisc, upside down—0.8 h25
Eye platePETGplate, lug up—0.5 h6
Total1.46 kg PETG, 0.21 kg PLA47.6 h1671 g

Pod mounts P and S are mirror images: print one of each, not two of either.

  1. Float body and tail cup first. They are the two biggest prints and the two that matter most to sealing.
  2. Leave supports off. Every part was checked layer by layer (design/torpedo/print_verify.txt): each layer stands on the one below. If you switch supports on, the slicer will put a little under small round roofs (insert holes, the fin's shackle holes) because it supports every bridge over 10 mm by default. They are not needed.
  3. PLA only where the table says. The sleds sit dry at lake temperature and the fairing is free-flooding and lightly loaded. Everything that seals, takes the link's load, or sits in the float in the sun is PETG.

After each print

Check

Step 2 — Clean up, tap and fit inserts

Time: 1½ h.

  1. Sand the two sealing bores smooth with 400 then 600 grit, especially across the seam and over the tail cup's lead-in. Do not coat either with anything.
    • The tail cup's bore, 96.7 mm across, from 24 to 50 mm below its rim.
    • The float cap's bore, 112 mm across, inside the cap above its thread.
  2. Tap the aft face. The face is 4 mm thick. From outside, square to the face:
    • the two pod-gland holes (14.5 mm, low on each side) M16 × 1.5;
    • the link-gland hole at the centre (18.5 mm) M20 × 1.5. The 8.5 mm valve hole is not tapped.
  3. Tap the float's bottom. The link-gland hole (18.5 mm, in the 12 mm boss on the bow side) M20 × 1.5, from below. The 13.2 mm SP13 hole and the 8.5 mm valve hole, on the bosses on the upper cone, are not tapped.
  4. M3 inserts, tail cup. Each of the three bosses inside the aft face takes two blind M3 inserts back to back, with 2 mm of solid between them:
    • from outside, three into the aft face (they take the tail fairing's screws);
    • from inside, three into the boss tops, about 205 mm down from the rim (they take the aft sled's screws). Keep the iron square: there is no second chance at that depth.
  5. Float inserts.
    • Turn the float body over onto a padded surface. Press two M4 inserts into the two 5.6 mm holes beside the centre of its bottom (they take the eye plate).
    • Turn it upright. Press three M3 inserts into the boss top, about 178 mm down through the opening, on the 32.5 mm circle (they take the mast).
  6. Mark it. BOW on the nose; an arrow toward the bow on the tail cup's fin.

Check

Step 3 — Seal the shells

Time: 30 min per coat, two coats, 24 h cure each.

FDM at six walls is close to watertight, not certain. A thin epoxy coat over the wet surfaces closes it.

  1. Wipe the tail cup, the nose and the float body with isopropyl alcohol.
  2. Mask everything that seals or fits:
    • the tail cup's bore, lead-in, thread and the 45° seat at its rim;
    • the nose's spigot, grooves, thread and shoulder;
    • the float body above the shoulder (the band, thread and spigot);
    • the faces of the two bosses on the float's upper cone, where the SP13 and the valve seat;
    • a dab of tape over each insert, gland hole, valve hole and the SP13 hole.
  3. Brush one thin coat of laminating epoxy on:
    • the tail cup's outside, including the fin and the rail;
    • the nose's outside, cylinder and cone;
    • the float body's outside below the shoulder, including its underside.
  4. Let it cure, scuff it lightly, and brush the second coat.
  5. The keel's lead. Cut the keel's bars now (step 18 gives their sizes) and dip or brush them all over with the same epoxy, so they cure with the shells.

Tips

Check


Fit and test the shells: steps 4 to 6. Both empty bodies are pressure-tested before anything goes inside.

Step 4 — Fittings and O-rings

Time: 1 h. You need: two bolt-in Schrader valves; the SP13 socket; two 90 × 3 mm and two 105 × 3 mm NBR O-rings; silicone grease; 20 AWG red and black and 24 AWG silicone wire; two soft (rubber or nitrile) washers.

Section through the float: the boss, the mast and Feather, the joint, the antenna in the cap's band
Section through the float: the boss, the mast and Feather, the joint, the antenna in the cap's band
  1. Torpedo test valve in the 8.5 mm hole low on the aft face, stem outward, nut inside.
  2. Wire the SP13 before it goes in. Its solder cups end up facing into the float. Solder, as on the spar (WIRING_GUIDE.md §1):
    • pin 1 (charge +): 20 AWG red;
    • pins 2 and 4 (ground): 20 AWG black;
    • pin 3 (control): 24 AWG. Leave each about 1.7 m long; they run through the hose to the carrier. Make up the ON cap and the charge adapter as on the spar (BUILD_GUIDE.md step 7.2).
  3. SP13 onto the float's upper cone. From outside, into the 13.2 mm hole in the boss on the port side, 29 mm above the still waterline: flange and gasket on the boss's flat face. Inside, reach in through the opening: a soft washer on the curved inner cone, then the nut, started by hand and tightened with the thin spanner while you hold the socket square outside. The ON cap will be in reach from a boat.
  4. Float test valve the same way in the 8.5 mm hole in the boss on the starboard side: soft washer and nut inside.
  5. O-rings.
    • Grease the two 90 × 3 mm O-rings and roll them into the two grooves on the nose's spigot.
    • Grease the two 105 × 3 mm O-rings and roll them into the two grooves on the float body's spigot. They stretch about 2 % onto the grooves; do not roll them twisted.

Check

Step 5 — Dry-fit both joints

Time: 10 min.

The O-rings clear the female thread crests by 0.5 mm, so they never ride over a thread. On the torpedo they enter the bore over an 18° lead-in; on the float, over the cap's 45° lead-in.

  1. Nose: hold it square to the tail cup's rim and slide it in until the threads meet. Then turn it on: two starts, so it picks up within half a turn. As it turns, the O-rings pass the cup's thread crests and ride the lead-in into the bore; grease makes that smooth. It closes in 2 turns and its shoulder seats on the 45° seat at the rim. There is no key and no right way round: the nose carries nothing.
  2. Cap: set it on the float body square, and turn it on. Its thread crests pass over the body's O-rings with 0.5 mm to spare. It closes in 1⅓ turns. It carries nothing either.
  3. Take both off again.

Check

Step 6 — Pressure test #1

Time: 45 min. Not before: 24 h after the second epoxy coat.

This tests both empty bodies before anything goes inside. The torpedo and the float are separate sealed volumes, each with its own valve.

  1. Blank the gland holes. Screw a gland into each hole, its sealing washer on the outside face, closed on a dowel or rod: 6 mm in the two M16 pod glands, 12 mm in the two M20 link glands.
  2. Torpedo: grease the O-rings and screw the nose on (step 5).
  3. Float: fit the ON cap on the SP13 and screw the cap on.
  4. Pump each through its valve to 0.1 bar (1.5 psi): a stroke or two of a floor pump, watching the gauge. Stop there.
  5. Submerge each in the tank. Empty, both float hard: the torpedo takes about 2.3 kg of weight to hold under, the float about 4 kg. Watch for 10 minutes:
    • torpedo: the seam, the fin and rail, the glands, the valve, the joint;
    • float: the seam, the bottom boss and its gland, the two bosses on the upper cone, the joint.

To fix a leak: mark it, release the pressure, dry it, and give that area another thin coat of epoxy (never a bore, spigot or thread). Re-seat a leaking gland or fitting. Wait for any epoxy to cure and test again.

Check

Release the pressure, take the nose and cap off and unscrew the blanks.


The link: steps 7 to 10. The pods go on, the cables go through the hose, the link is sized on the bench, then the float and the torpedo are joined for good.

Step 7 — Pods and their glands

Time: 1 h. You need: two thruster pods; the two pod mounts; two M16 × 1.5 IP68 cable glands (4–8 mm clamp); 9 mm adhesive-lined heat-shrink; four M4 A4 bolts with nyloc nuts and washers.

The torpedo: the fin with its shackle holes, pods on their raised mounts at the tail, keel underneath
The torpedo: the fin with its shackle holes, pods on their raised mounts at the tail, keel underneath
  1. Pod mounts on. Close the two half rings round the tail cup just forward of the aft face (z_l 8 to 38), P to port. Their flanges meet either side of the 8 mm key ridge above the canister and the rail below it. Bolt them together through the ridges with an M4 bolt top and bottom, long enough to pass both flanges and the ridge (34 mm) and take a nut. Firm, not crushing.
  2. Pods into the collars. Each collar sits at the end of an arm angled up from the ring, so the pod's axis is 58 mm above the canister's axis: there its thrust balances the link's pull on the fin, and the torpedo stays level when it pushes. Slide each pod into its collar, its intake forward and its outlet aft, centred in the 30 mm collar. If the pod has a mounting lug on its duct, set it in the collar's outboard split or clear of the collar's ends. Clamp each collar with an M4 pinch bolt through its ears.
  3. Sleeve the leads. On each pod, slide adhesive-lined heat-shrink over its three wires where the gland will grip, and shrink it, so the gland seals on one round cable. Extend the leads as on the spar so they reach from the aft face, out through the tail cup's rim, to the ESCs on the sled stack held just in front of the rim, with a service loop (WIRING_GUIDE.md §2, cable 8). Stagger the bullet connectors so they pass the gland one at a time.
  4. Leads into the tail cup. Feed each pod's bullets in through its gland, port pod through the port gland, with the gland's seal insert slackened. Screw the gland into the face, sealing washer outside, and tighten its dome nut on the heat-shrink. Fit its locknut inside.

Check

Step 8 — The harness in the hose

Time: 1½ h. You need: about 1.7 m of 12 × 8 mm PU recoil air hose, ends cut off; silicone wire (22 AWG × two; 26 AWG × seven); the SP13's three wires from step 4; the ANN-MB on its own lead; a draw wire.

Everything that joins the float to the torpedo runs inside the hose:

RunConductorsFloat endTorpedo end
Signal harness22 AWG: 3V3, GND. 26 AWG: SDA, SCL, PWM L, PWM R, VSENSE, and two grounds, one twisted with SDA and one with SCLFeather pads 3V, GND, SDA (GPIO 3), SCL (GPIO 4), 13, 12, A0; the two twist grounds to its GNDcarrier J7; the two twist grounds joined to its GND
Charge/control20 AWG CHG+ and GND, 24 AWG CTLSP13 pins 1, 2+4, 3 (step 4)carrier J2, CHG+ through a 5 A fuse
Antenna coaxRG174, the antenna's own leadthe ANN-MBthe GPS board's SMA, through a right-angle plug

Check

Time: 1½ h. You need: about 0.6 m of 6 mm marine shock cord; about 1.5 m of 2–3 mm Dyneema line; two stainless D-shackles; the hose from step 8; the luggage scale; weights of 1.5 kg and 0.5 kg; a hook to hang things from.

The link is the shock cord and the coiled hose side by side between two shackles. Both carry the torpedo: a recoil hose rests as a closed coil and pulls back like a spring, somewhere between 13 and 47 N/m. So the hose is measured first, and the cord is cut to suit it. The target, from the design: under 1.5 kg (the torpedo's weight in water) the link measures 610 mm between the shackle holes, and it is no stiffer than about 85 N/m (stiffer, and a 0.5 m wake dunks the antenna). This is done on the bench, before the hose's ends go into their glands.

  1. Choose the shackles by fit. Each must have a pin no thicker than 6 mm, to pass the 6.5 mm holes, and a jaw wider than 10 mm, to straddle the fin and the eye plate's lug, which are both 10 mm thick.
  2. Lash the hose to the shackles. Pick two points on the hose with five turns of coil between them. Lash the hose at each point to one shackle's bow with several tight turns of Dyneema, finished with a knot and a dab of glue, so the shackle takes the hose's pull. The hose beyond each lashing, to its end, will run slack to its gland.
  3. Measure the hose. Hang the top shackle from the hook and pull the bottom shackle down with the luggage scale until the two shackle holes are 610 mm apart. Read the pull. Pull to 710 mm and read it again. The difference, in newtons, times 10, is the hose's stiffness in N/m.
    • If the hose alone is stiffer than about 60 N/m, it is too stiff for the link: use a longer recoil hose (more turns) or a softer one.
    • Write down its pull at 610 mm.
  4. Make the cord. Put an eye in each end of the shock cord (a crimped shock-cord clamp or a tight whipping) and shackle it between the same two shackles, inside the hose's coil, so the link is cord and hose together. Hang 1.5 kg from the bottom shackle. Adjust the cord's length until the link measures 610 mm hole to hole: shorten the cord if it is longer, lengthen it if shorter.
  5. Check the stiffness. Add the 0.5 kg. The link must stretch at least 58 mm more (4.9 N at 85 N/m). Less than that and the link is too stiff: a longer cord of thinner section, or a softer hose.
  6. Make the limit line. Splice an eye in each end of the Dyneema line (knots slip in Dyneema) so it measures 920 mm hole to hole, 310 mm longer than the link at rest, shackles included. It goes taut at about 41 N, above any wake load, and stops a snag or a lift from over-stretching the cord.
  7. Take the weights off. Leave the cord, the hose's lashings and the limit line on the two shackles.

Check

Time: 1 h. You need: the eye plate and two M4 screws; two M20 × 1.5 IP68 glands that clamp 12 mm; the tail fairing; stainless locking wire.

Exploded float: cap, antenna on its platform, O-rings, mast with the Feather, body
Exploded float: cap, antenna on its platform, O-rings, mast with the Feather, body
  1. Eye plate. Screw it under the float with two M4 screws into the inserts: the plate fore and aft, its lug (16 mm long, 10 mm thick) hanging down on the float's axis with its 6.5 mm hole running across.
  2. Float end of the hose. Screw an M20 gland into the float's tapped hole from below, sealing washer on the bottom face. Push the hose's float end up through it, with its wires and the antenna, until about 30 mm of hose stands above the boss inside. Tighten the dome nut on the hose.
  3. Top shackle. Its pin through the eye plate's lug. The hose between its lashing and the gland is slack.
  4. Torpedo end: fairing first. Thread the hose's torpedo end in through the tail fairing's tip (36 mm opening) and out of its open front. The fairing now lives on the hose; it slides forward onto the aft face in step 20.
  5. Torpedo end through its gland. Screw the second M20 gland into the centre of the aft face, sealing washer outside, locknut inside. Pass the hose forward through it, wires first, so that about 20 mm of hose stands inside the face, and tighten the dome nut. The wires run on out of the tail cup's rim.
  6. Bottom shackle. Its pin through the fin's middle hole (99 mm from the aft face). Step 19 may move it to the fore or aft hole.
  7. Mouse both shackle pins with stainless wire so they cannot unscrew.
  8. Tie the hose loosely to the fin through the tie holes it passes as it leaves the bottom shackle and runs aft: at 78 mm and at 56 mm, on the fin's sloped aft end (the third, at 170, is spare). It runs on over the fairing, round a 35 mm-radius turn behind the tail and in through the fairing's tip. It must not kink, and it must be slack between each lashing and its gland.

Check


Fit it out: steps 11 to 17. The sled stack is built and the float fitted out on the bench, the harness is bench-tested, the hose potted at both ends, then the stack goes in.

Step 11 — Build the sled stack

Time: 3 h. You need: the two sleds; one Bioenno BLF-1206A 12.8 V 6 Ah LiFePO4 pack; an XT60 female plug; an inline blade-fuse holder for 12 AWG with a 15 A fuse; the two ESCs; the carrier PCB, GPS board and BMM150 compass board; 8 M3 nylon standoffs and screws (5 mm and 4 mm); foam tape; thin straps; lead bars; four M3 × 12 A4 bolts and nuts and one M3 keeper bolt with nut; a right-angle SMA crimp plug for RG174; JST-XH 7 housing and crimps; a 5 A inline fuse holder.

Exploded torpedo: nose, the fore sled with the carrier, tail cup with the aft sled, pods, tail fairing, keel
Exploded torpedo: nose, the fore sled with the carrier, tail cup with the aft sled, pods, tail fairing, keel

The two sleds are built and bolted together on the bench, into one stack about 320 mm long. The fore sled's four bolts cross the rails sideways, and there is no room to put them in once the stack is inside the tail cup. Everything on the aft sled must pass the tail cup's 96.7 mm bore; everything on the fore sled must pass the nose's 87.8 mm spigot.

  1. Gate check. Measure the pack over its wrap: no more than 108 × 69 × 64 mm. Its corners then sit 47.1 mm from the axis, against a bore of 48.35 mm.
  2. Charge it fully on the bench.
  3. Battery lead. Cut off the Anderson Powerpole (Bioenno allows changing the connector; never open the pack) and fit, working away from the pack: the 15 A fuse holder in the red lead, then the female XT60, red to +. Twist the pair. Leave it long enough to reach the carrier's J1 with a service loop. Tape the barrel charge socket closed and tuck it along the pack: it is live.
  4. Battery-tray lead. Flat bars no more than about 27.5 mm wide and 7.5 mm thick, 108 mm long in all: about 0.27 kg. Slide them into the tray under the aft sled's floor from its open front end (at the battery's front, z_l 158.5). They bridge the 7 mm driver slot along the tray's bottom. Weigh them first and write it down.
  5. Battery onto the aft sled. Lay the pack flat on the floor between the side walls, its 108 mm length fore and aft, its aft end against the stop at the base. It has half a millimetre to spare each side.
  6. ESCs on top of the battery, flat, end to end along the middle: ESC R aft, ESC L forward.
  7. Strap them. Two straps, each through the 12 mm slots in both side walls, over the ESCs and the battery. Keep straps thin and buckles and cable-tie heads off the battery's corners: those corners are within about 1.2 mm of the bore.
  8. Fore sled onto the rails. Slide its two tabs between the aft sled's rails, its plate's aft end just ahead of the battery. Bolt it with two M3 bolts each side, through rail and tab, at 178 and 200 mm from the aft face: heads outside the rails, nuts inside the tabs, under the plate. Firm, no wobble.
  9. Fore-tray lead. Bars no more than about 33.5 mm wide and 31.5 mm tall, up to 94 mm long in all, slid into the tray under the fore sled's plate from its open fore end. Load the design figure, about 1.04 kg of the tray's 1.16, against the tray's aft end. Fit the M3 keeper bolt across the tray's open end (z_l 260) to hold them. The tank trim (step 19) sets the real amount. Weigh it and write it down.
  10. Boards on the fore sled, all flat on the 3 mm plate:
    • Carrier PCB on 5 mm M3 nylon standoffs in the plate's four holes at its aft end (80 × 50 mm), z_l 164–254.
    • GPS board on 4 mm M3 nylon standoffs in the four holes ahead of it (38.1 mm square), z_l 266–309.5, its SMA facing aft into the 12 mm gap.
    • Compass at the plate's tip, in the nose cone, on foam tape: flat and level, chip side up, JST connector toward the stern. Firmware .77's axis signs are measured for this orientation. Magnet-test every fastener near it: brass, nylon or stainless only.
  11. Wire the carrier as the spar's sled (BUILD_GUIDE.md step 6.3 and WIRING_GUIDE.md): ESC L power to J4 and signal to J8; ESC R to J3 and J9. Run the battery lead and the ESC power leads as twisted pairs, along the bottom, away from the compass. GPS to J5 (Qwiic), compass to J6.
  12. Finish the harness at the carrier. The hose's torpedo end comes out of the tail cup's rim; hold the stack just in front of the rim.
    • Coax: cut it so it reaches the GPS board's SMA with a gentle loop over the carrier, crimp on the right-angle SMA plug, and screw it on: finger-tight, then a slight nip. Its cable stands up from the board and runs aft over the carrier; a straight plug would stick out sideways past the nose's spigot.
    • Signal harness: crimp the seven wires into a JST-XH 7 housing, pins 1–4 3V3, GND, SDA, SCL; 5–7 PWM L, PWM R, VSENSE. Join the two twist grounds to the GND conductor next to the housing, under heat-shrink. Plug it into J7.
    • Charge/control: CHG+ through the 5 A inline fuse to J2-1, GND to J2-2, CTL to J2-3.
    • As on the spar, put pigtail connectors in the signal and charge runs (JST-SM 4 and 3, JST-SM 2 and an XT30) about 150 mm short of the carrier, so the stack can come out later without cutting anything.
  13. Battery to J1 last, then unplug it again until step 13.
  14. A desiccant sachet on the fore sled.

Check

Step 12 — Float fit-out

Time: 1½ h. You need: the mast and three M3 screws; the Feather; a 470 µF low-ESR capacitor; the antenna platform; a 100 × 0.6 mm aluminium disc; thin VHB tape; closed-cell foam; foam tape.

  1. Feather wires. Solder the harness's float end to the Feather's pads: 3V and GND (the 22 AWG pair, with the two twist grounds also to GND), SDA, SCL, 13, 12, A0. Solder a 470 µF low-ESR capacitor across 3V and GND at the pads. Leave its battery socket empty.
  2. Mast in. Lower it in through the float's opening, its C-shaped base open toward the hose gland, and screw its flange down with three M3 screws into the boss inserts. Keep the hose end clear of the flange.
  3. Feather on its shelf, with foam tape, USB-C reachable with the cap off. Its wires run down beside the mast to the hose end.
  4. Ground plane and antenna. Cut a notch about 8 mm wide in the aluminium disc's edge. Bond the disc onto the platform with thin VHB tape, its notch over the notch in the platform's rim. Bond the ANN-MB to the middle of the disc with VHB tape: its magnet does not grip aluminium.
  5. The antenna's lead. Run it from the antenna's side over the disc's edge, down through the notch, and down outside the mast to the hose end, with a gentle loop. It does not pass through the platform or the mast.
  6. Platform on. Slip the platform's socket over the mast top. Its top sits just inside the spigot's mouth (z' 188), and the antenna clears the inside of the cap by 4 mm.
  7. Foam. Fit a ring of closed-cell foam round the mast, low down, clear of the hose end and the mast's screws.
  8. A desiccant sachet in the float.

Check

Step 13 — Bench test before potting

Time: 2 h, most of it waiting. The stack sits on the bench in front of the tail cup, joined to the hose's cables but not yet inside; the nose and cap are off; the float lies beside the torpedo. Plug the battery into J1, fit the ON cap on the SP13 and connect from the Console over Bluetooth.

  1. Power. With the ON cap fitted, the carrier's red and green LEDs light and both ESCs chirp. Measure 3.30 V at the carrier's J7 pin 1 and no more than about 0.1 V less at the Feather's 3V pad.
  2. Commands:
SendExpect
command:versionthe firmware line. Battery: none is normal; GNSS: ok
command:i2cscan0x42 (GPS) and 0x13 (compass) both answer, across the 1.7 m harness
command:escdiagboth ESCs attached
  1. Heading. With the stack still on the bench, away from steel, note the heading at four headings a quarter-turn apart: it must follow the turns. (Heading with the motors running comes in step 16.)
  2. Charge test. Take the ON cap off and fit the charge adapter. The charger shows that it is charging and the buoy stays off.
  3. I²C soak. Refit the ON cap and leave it running for an hour with the Console connected. The GNSS and compass must stay live throughout, with no GNSS went quiet lines; command:i2cscan and command:version must still pass at the end.

If the I²C bus misbehaves (devices missing from the scan, or dropouts in the soak): the firmware runs the bus at 400 kHz. The GPS board's own 2.2 kΩ pull-ups (enabled as shipped) already parallel the carrier's 4.7 kΩ, about 1.5 kΩ in all, which is enough for 1.7 m of harness. Do not add pull-ups: more would overload the bus. In order of effort:

Do not pot the hose until the soak passes: potting makes the harness permanent.

Check

Take the ON cap off and unplug the battery from J1 before potting.

Step 14 — Pot both ends of the hose

Time: 1 h, then the compound's cure. You need: flexible potting compound (silicone or polyurethane); putty; a syringe or a long nozzle.

The plug inside each end of the hose makes the float, the hose and the torpedo three separate sealed spaces. A leak in the float cannot drain down the hose into the battery, and a cut hose, the most exposed part of the buoy, floods only itself.

  1. Prepare the wires where they lie inside each hose end, as on the spar (BUILD_GUIDE.md step 7.6): strip a 5 mm band of every wire's insulation and tin it, staggered up and down so no two bare spots can touch. On the coax, remove a 5 mm band of its jacket so the potting reaches the braid: water must not wick along a conductor or along the braid past the plug.
  2. Torpedo end. Stand the tail cup aft face down on a ring or a bucket rim, so the hose end, about 20 mm inside the aft face at its centre, points up. The stack stays outside on its cables. Pack a pea of putty into the hose end round the wires, about 25 mm down, then fill the hose end to its top with the compound, using the syringe or nozzle.
  3. Float end. With the float standing level, do the same through its opening: putty about 25 mm down, then fill to the top of the hose.
  4. Leave both to cure fully, without moving the cables.

Check

Step 15 — The stack into the tail cup

Time: 1 h. You need: three M3 screws; the long 2.5 mm ball-end hex driver.

Section through the torpedo, bow on the left: the sled stack with the battery, ESCs, carrier and lead trays; keel
Section through the torpedo, bow on the left: the sled stack with the battery, ESCs, carrier and lead trays; keel
  1. Dress the cables. The hose's cables and the coax come in through the centre gland: lead them through the large hole in the middle of the aft sled's base disc from behind, and forward along the battery, so the stack can slide over them. Pass each pod's lead through the cut-out round its gland.
  2. Slide the stack in. Keep it centred and feed it straight in through the thread and the bore. Nothing should catch: if it does, find what stands proud (a strap buckle, a tie head, a lead over a battery corner).
  3. Join the pod bullets with the stack most of the way in and the ESCs' leads still in reach at the rim, port pod to ESC L, then feed the leads in as the stack goes home and the base disc sits on the three boss tops.
  4. Screw the base disc down with three M3 screws into the inserts on the boss tops, about 205 mm below the rim, with the long driver:
    • the two upper screws past the sides of the battery;
    • the bottom screw straight down the 7 mm slot under the battery tray, which leads to it; the bars bridge the slot above the driver.
  5. Battery to J1. Fit the ON cap.
  6. Direction check:
SendExpect
command:thrust:20, then command:stopboth pods blow water out aft
command:thrust:-20, then command:stopboth blow forward

Run the pods in a bucket of water, or dry for no more than a few seconds.

Check

Step 16 — Thrust, current and the one-pack ceiling

Time: 1 h. You need: the luggage scale; the clamp meter; the bucket or tub; cord for a bridle.

The torpedo carries one battery pack, rated 12 A continuous. The firmware's hard ceiling, MAX_THRUST (400 µs), was set for the spar's two packs and an estimated 12–15 A with both pods flat out. Until that ceiling is lowered in firmware (not done yet), the safe limit is the tmax you set here.

The nose must be off to reach the battery lead, so the pods are run with the torpedo standing nose up, its tail dipped in water, the open front well clear of it.

  1. Rig it. The tail fairing stays slid back on the hose. Tie a cord bridle under the two pod mounts' arms, between the ring and the collar, and hang the torpedo nose up from the luggage scale. Lower it into the bucket until the water is about 120 mm above the aft face: the pods are then under, and the rim (218 mm) is about 100 mm clear of the water. Leave room under the tail for the wash. Note the reading at rest.
  2. Clamp meter on the battery lead, reached through the open front.
  3. For each of 75, 150 and 250: allow it first (for example command:gains:tmax=150), send command:thrust:N, read the scale and the current once they steady, then command:stop. Forward thrust pushes the torpedo toward its nose, so the scale reads less: the drop is the thrust. Write both down. Stop climbing as soon as the current nears 10 A.
  4. Heading with the motors. At each setting, note the heading with the motors stopped and running. Write the shift down: the power pairs end at the carrier, 70 to 160 mm behind the compass.
  5. Set the ceiling. Choose tmax at or below the setting that kept both pods under about 10 A, with smax about three-quarters of it, for example command:gains:tmax=150,smax=110. Then command:gains:save.

Tips

Check

Step 17 — Close up and pressure test #2

Time: 45 min. Not before: the potting has fully cured.

  1. Nose: check the O-rings are clean and greased, and screw the nose on over the fore sled: 2 turns, hand-tight (step 5's way).
  2. Cap: grease its O-rings and screw it onto the float: 1⅓ turns.
  3. Torpedo: pump through its valve to 0.1 bar. This tests the canister and its glands; the hose is sealed off by its plug. It may no longer float: support it on a line in the tank. Watch for 10 minutes: the glands, the joint, the valve.
  4. Float: fit the ON cap, pump through its valve to 0.1 bar and hold it under for 10 minutes: the bottom boss and its gland, the bosses on the upper cone, the joint.

Check


Trim and first water: steps 18 to 21. Keel, the tank trim, the compass, and the water.

Step 18 — Keel and its lead

Time: 45 min. You need: the keel; the keel's lead bars, sealed in epoxy (step 3); two M4 bolts about 35 mm long and two M4 bolts for the lead keepers, with nyloc nuts.

The torpedo from below: keel, pods, tail fairing
The torpedo from below: keel, pods, tail fairing
  1. Keel on. Slide its top slot over the rail under the canister, its lead slot opening forward, and bolt it through the rail with two M4 bolts, at 74 and 190 mm from the aft face.
  2. Lead. The bars, already sealed in epoxy: no more than about 19.5 mm thick and 49.5 mm deep. Slide them into the keel's slot from its fore end. The slot runs from 66 mm from the aft face, where its lower aft corner is chamfered at 45°, forward to the first keeper's hole at 198 mm. Fill it: about 1.29 kg.
  3. Keepers. Fit both M4 keeper bolts across the slot, at 198 and 205 mm, in front of the bars.
  4. Weigh the bars that went in and write it down.

Check

Step 19 — Tank trim

Time: 2 h. You need: the tank; the spring balance; a short loop of line; the kitchen scale; spare lead bars.

The torpedo must weigh 1.5 kg (14.7 N) in water and hang level from its shackle. That weight is what the float carries and what sets the link's length. The lead and the choice of shackle hole set both.

  1. Weigh the torpedo in air, closed, keel on, and subtract the lead you have weighed in so far (steps 11 and 18): that is its weight without lead. Compare it with the design's figure in design/torpedo/torpedo_hydro.txt: each 100 g the parts come in heavier needs about 110 g less lead, because each 100 g of lead adds only about 91 g in water.
  2. Hang it in the tank. Unhook nothing from the link: lay the float beside the tank with the link slack. Hook the spring balance's loop into the bottom shackle, in the fin's middle hole, beside the link's eyes, and hang the torpedo fully under water, clear of the bottom and the sides.
  3. Read it. Target 1.5 kg.
    • Heavier: take bars out of the fore tray.
    • Lighter: add bars to it (it holds 1.16 kg). Each 100 g taken out of the fore tray also lifts the nose about 2.4°; each 100 g added drops it as much.
  4. Level it. Look along the canister: the axis must be horizontal. In order of reach:
    • If it hangs nose up: slide the fore tray's bars forward. They start against the tray's aft end; slid all the way up to the keeper they drop the nose about 2.2°. Put a spacer behind them so they stay there. (They cannot go further aft, so this does not help a torpedo that hangs nose down.)
    • Move the shackle: the other two holes, 12 mm either side of the middle one, tip it about 4.3° each way. If it hangs nose down, move the shackle forward, to the hole at 111 mm (about 3.9° nose up). If it hangs nose up, move it aft, to the hole at 87 mm (about 4.7° nose down).
  5. To change the fore tray: lift the torpedo out by the fin, dry it, unscrew the nose, take out the keeper bolt and slide bars in or out of the tray's open fore end under the plate. Refit the keeper. Grease the O-rings and close it again.
  6. Repeat until it reads 1.5 kg and hangs level. Write down the lead in each space, the shackle hole and the torpedo's all-up weight, and compare them with torpedo_hydro.txt. Mouse the shackle pin again if you moved it.
  7. The float. Float the whole buoy in the tank, the torpedo hanging on the link. The waterline should be about 99 mm above the float's bottom, 14 mm above its widest point, with 164 mm of float above the water, and the SP13 and valve clear above it.
  8. Level under thrust (optional). Hanging still from the balance, the line takes all the thrust at the shackle, 16 mm above the pods, so short runs tilt it nose-up by about 0.4° per newton. That is expected here; on the water its own drag shares the load and it stays level.
  9. Pressure test #3: the torpedo through its valve, 0.1 bar, 10 minutes, after the last time the nose was off.

Tips

Check

Step 20 — Tail fairing and compass calibration

Time: 1 h. You need: three M3 screws; the long 2.5 mm ball-end hex driver; a non-magnetic stand.

  1. Fairing on. Slide the tail fairing forward along the hose onto the aft face, the pod leads through the slots in its root and its three tabs on the three outside inserts. Screw it on with three M3 screws, reaching in through the 36 mm tip opening with the ball-end driver at an angle.
  2. The hose now runs from the fin, over the fairing, round a 35 mm-radius turn behind the tail and in through the tip. Check it is not kinked or pinched anywhere.
  3. Compass calibration. Outdoors, away from cars and steel benches, with the torpedo closed, the float alongside. In the Console, right-click the buoy on the Mesh tab, Calibrate compass…, Start turn, and turn the torpedo slowly and level on the stand through two full turns, about a minute each, carrying the float round with it. When the window says Good fit, check the declination and Send to buoy. From firmware .70 the buoy refuses Hold Pos and Go Home until this is done.
  4. Direction check. Turn the torpedo to the right and see the heading rise. A board lying chip side down calibrates cleanly and reads backwards.

Check

Step 21 — First water

Time: an afternoon. You need: water at least 1.4 m deep at the spot; a retrieval line with a small float.

Retrieval line. If the torpedo floods, about 1.6 L of water gets in: the float then carries about 4.1 kg of its 4.6 L and floats low. The buoy stays up, but the electronics are lost, and a flooded float as well would sink it. Tie a line to the torpedo's fin shackle, beside the link, with a small float on its other end, until the buoy has earned trust.

Launching. Lower the torpedo in first, by the fin, until the link takes its weight. Then let the float go. To recover it, lift the float to reach the link, then lift the torpedo out by the fin.

First-water checklist

First tests on the water. The design leaves these to a real buoy:


Appendix A — Opening it up

Float

  1. ON cap off.
  2. Cap: unscrew it 1⅓ turns and lift it off. The antenna, the Feather (USB-C reachable) and the mast are in plain view.

Torpedo

  1. Lift it out by the fin and dry it, joint uppermost.
  2. Nose: unscrew it 2 turns and draw it straight forward off the fore sled. The fore sled, carrier, GPS board and compass are in plain view; the fore tray's lead is reachable at its open fore end, behind its keeper bolt.
  3. The stack out, only if the battery, an ESC or the battery-tray lead must be reached. The fore sled's bolts cannot be reached inside the tail cup, so the stack comes out whole: undo the base disc's three M3 screws with the long 2.5 mm driver (the bottom one down the slot under the battery tray), and draw the stack out forward, unplugging the pod bullets as they come within reach. The hose's cables stay on the carrier; unplug the pigtail connectors if the stack must go further.
  4. Fairing, only to reach the torpedo's valve or a gland: three M3 screws through the tip opening, then slide it back along the hose.

To close it: dress the cables, slide the stack in and screw it down (step 15), grease the O-rings and screw the nose on, 2 turns hand-tight. Pressure-test through the valve at 0.1 bar after any opening that disturbed the seal (step 17), then refit the fairing.

Charging and switching on never need either body opened: both are done at the SP13 on the float's upper cone.

Appendix B — Swapping a pod

  1. Open the nose and draw the stack out far enough to reach the pod's bullets (appendix A); unplug them.
  2. Take the tail fairing off.
  3. Loosen the pod's gland dome nut and slacken its seal insert.
  4. Undo the collar's pinch bolt and slide the pod out of its collar, drawing its wires out through the gland one bullet at a time.

Refitting is the reverse (step 7). No splicing is needed. Repeat the direction and stop checks (step 15) and the torpedo's pressure test (step 17).

Appendix C — Routine checks

Before each launch

After each outing

Each season, and after any knock

Appendix D — Troubleshooting

SymptomLikely causeRemedy
Nose or cap will not startthread dirty, or a string in itclean the thread; it starts at either of two positions half a turn apart
Nose grates or binds as it turnsdry O-rings, or the seam proud in the bore or on the lead-ingrease the O-rings; sand the bore and lead-in at the seam with 600 grit
An O-ring comes out nickeda burr at the bore's lead-in or on a groove edgedeburr it; replace the O-ring
The stack catches going into the tail cupsomething stands proud: a strap buckle, a tie head, a lead over a battery cornermove it off the corners; everything on the aft sled must stay within the 96.7 mm bore
Pressure falls but no bubbles are foundvalve core, or the SP13's sealcheck the valve tip under water; re-seat the fitting and its soft washer
Bubbles along the seam at the backthe layer seam leakingdry it and give it another thin coat of epoxy; never a bore, spigot or thread
Bubbles at a glandgland not tight on the heat-shrink or the hose, or its washerre-seat the washer; tighten the dome nut
GPS or compass missing from command:i2cscan, or I²C dropoutsthe 1.7 m harnessstep 13: check the twisted pairs and their routing; then 100 kHz or a PCA9615 extender. Do not add pull-ups
Feather resets when WiFi or BLE is busy3.3 V sagging over the harness22 AWG for 3V3 and GND; the 470 µF capacitor at the Feather's pads
Thrusters cut out a few seconds into hard thrustthe pack's protection board tripped: 12 A continuouslower tmax; reset the pack by fitting the charge adapter for a few seconds
Heading shifts when the motors runmotor current near the compassstep 16: twist and reroute the power pairs; keep tmax low
Heading wanders in wakesthe torpedo rocking; no tilt compensationexpected until a tilt-compensating IMU is fitted (step 21)
Heading reads backwards after a clean calibrationcompass board chip side downmount it chip side up, connector aft; recalibrate
Torpedo hangs nose down or nose uplead in the wrong place along itstep 19, item 4: slide the fore bars, or move the shackle
Float rides low or highthe torpedo is heavier or lighter than 1.5 kg in waterre-trim in the tank (step 19)
Torpedo hangs deeper or shallower than it shouldthe link has stretched or stiffenedre-check it (step 9)
The coil is wound tightthe torpedo kept turning one wayunwind it by turning the float; the firmware does not yet unwind it
One pod pushes the wrong waytwo motor phases swappedswap any two bullets on that pod
ESCs do not chirpON cap not making contact, battery plug off J1, or the 5 A fusecheck the cap's link, J1 and the fuse; look for the carrier's LEDs

Appendix E — Dimensions on one page

ItemValue
Buoyfloat 220 dia × 263 tall at the surface; torpedo axis 800 below the still waterline; pod tops 708, keel bottom 917 below; water at least 1.4 m
Float body220 dia × 190 tall; skin 2.6 (six perimeters), 2.0 under the O-ring grooves; flat bottom 84 dia; widest at z' 85; a 7 mm vertical band below the shoulder; thread z' 156–172; spigot z' 172–190
Float cap123 dia × 107 tall; a 19 mm band round the antenna, a 45° cone, a round tip; top z' 263
Float jointtwo-start, 6 pitch, 12 lead, 2 deep, 45° flanks, 16 long: 1⅓ turns; two 105 × 3 NBR O-rings on the body's spigot in a 112 bore; the cap's thread crests 0.5 clear of them; opening 103.1
Float bottomlink gland M20 × 1.5 (18.5 hole, tapped, 22 off centre, bow side); two M4 inserts for the eye plate; three M3 inserts inside for the mast on a 32.5 circle
Float upper coneSP13 (13.2 hole, port) and test valve (8.5 hole, starboard) on bosses 24 and 20 dia, 2.5 proud, at z' 128, 29 above the still water
Eye plate33 × 24 × 5; lug 16 long, 10 thick and 22 deep, with a 6.5 shackle hole 16 below the float's bottom, on its axis
Mast26 dia tube, flange 41 dia, three M3 screws; no cable window; Feather shelf top z' 150
Antenna platform100 dia, top z' 188, a notch in its rim (bow side) for the antenna's lead; the aluminium disc and the ANN-MB bonded on with VHB; 4 clear of the cap
Torpedo canister108 dia, wall 2.6; aft face 4 thick; aft face to nose tip 347; 427 with the tail fairing; 259 across the pods
Torpedo jointtwo-start, 6 pitch, 12 lead, 2 deep, 45° flanks, 24 long: 2 turns; two 90 × 3 NBR O-rings on the nose's spigot in a 96.7 bore (z_l 168–194) with an 18° lead-in; the cup's thread crests 0.5 clear of them; spigot wall 2.0 under the grooves; rim z_l 218; nose spigot inside 87.8
Aft facetwo pod glands M16 × 1.5 (14.5 holes, 30 each side, 10 below the axis); link gland M20 × 1.5 (18.5, centre); valve 8.5 (16 to port, 34 below the axis); three bosses on an 88 circle, each with two M3 inserts back to back
Fin10 thick, 30 above the canister, z_l 44–210; three 6.5 cross holes for the link's D-shackle at z_l 87, 99 and 111, 10 below the fin's top (99 nominal); hose tie holes at z_l 78 and 170 (6 below the top) and 56 (15 below, on the sloped aft end); key ridges 8 tall
Keel26 thick, 63 below the canister, z_l 44–210; lead slot 20 wide and 50 deep over a 3 mm floor, from z_l 66 (lower aft corner chamfered 45°) to the M4 keepers at z_l 198 and 205, open forward, about 1.29 kg full; two M4 bolts to the rail at z_l 74 and 190
Podsduct 69 dia × 75 long, axes 95 either side and 58 above the canister's axis, collars centred at z_l 23, 30 wide, on arms angled up from the rings
Tail fairing80 long, wall 2.2, 36 tip opening; three M3 screws into the outside inserts
Aft sledbase disc 95.2 dia on the bosses, three M3 screws; floor and walls round a 69 × 64 battery and a 28 × 8 lead tray under the floor, all ending at the battery's front (z_l 158.5); a 7 wide driver slot along the tray's bottom to the bottom screw; rails z_l 118–205, lapping the walls by 40; nothing more than 47.8 from the axis
Fore sledplate 62 wide and 3 thick, z_l 159–339, with M3 holes for the carrier's standoffs (80 × 50) and the GPS board's (38.1 square); the compass taped at its tip; lead tray 34 × 32, z_l 164–258, open forward, M3 keeper at z_l 260; bolted between the rails at z_l 178 and 200 (u −10); nothing more than 42.9 from the axis
Batteryone 12.8 V 6 Ah LiFePO4 pack (Bioenno BLF-1206A), 108 × 69 × 64, z_l 50–158; 15 A fuse in its lead
ESCsflat on top of the battery: ESC R aft, ESC L forward; power leads twisted, run low
Boardscarrier PCB z_l 164–254; a 12 mm gap for the right-angle SMA plug; GPS board z_l 266–309.5; compass at z_l 325, 302 from the motors
Linkstainless D-shackles (pin up to 6, jaw over 10) through the eye plate's lug and the fin; shock cord and 12 × 8 PU recoil hose side by side between them, the hose lashed to both, five turns round the cord (about 1.7 m of hose in all); 610 hole to hole under 1.5 kg, no stiffer than about 85 N/m; Dyneema limit line 920 hole to hole; hose potted at both ends
Harness3V3 and GND 22 AWG; SDA and SCL 26 AWG, each twisted with a 26 AWG ground; PWM L, PWM R, VSENSE 26 AWG; CHG+ and GND 20 AWG, CTL 24 AWG; RG174 coax with a right-angle SMA plug; about 1.7 m
Leadkeel about 1.29 (full, sealed in epoxy), the tray under the battery about 0.27 (full), the tray under the carrier about 1.04 of its 1.16; the tank sets the real amount
Trim authorityshackle hole ±12 mm: +3.9° / −4.7° (about 4.3° each way); the fore bars from aft end to keeper: about 2.2°, nose down only; 100 g in the fore tray: about 2.4°
Weightssee design/torpedo/torpedo_hydro.txt: the torpedo without and with lead, the float, all-up (about 6.3 kg; the float alone 0.97 kg)
In the watertorpedo 1.5 kg (14.7 N) in water, hanging level; float waterline 99 above its bottom, 164 above the water, 214 wide there; reserve 2.16 kg; GNSS antenna 104 above the water
Pressure test0.1 bar (1.5 psi) for 10 minutes, submerged, each body through its own valve; hand pump only